ZHENWEI MACHINERY
Quality Control & Documentation
Connect product and process requirements with the relevant technical documents.
Make quality requirements traceable to the proposed equipment
A useful quality review connects each requirement to the supplied machine or component. Identify the model, drawing revision, screen specification, contact components and agreed acceptance checks. A generic company certificate is not a substitute for evidence about the actual supplied configuration.

Agree the inspection and record scope
| Checkpoint | Record to agree | What the record should establish |
|---|---|---|
| Identity and configuration | Model/reference and the agreed drawing | Check inlet/outlet arrangement, overall envelope and included accessories |
| Screen and contact components | Aperture, wire/medium, frame and specified materials | Link the supplied screen or component to its identification and requested documents |
| Assembly and condition | Screen fixing, seals, drive/support arrangement and access | Agree which observations or checks form the order-specific inspection record |
| Application performance, if a trial is agreed | Sample, aperture, feed, duration and collected streams | Record accepted output and limits; do not convert a catalogue figure into a material guarantee |
| Dispatch and handover | Machine/component identification and packing/document list | Match the packing information to the agreed scope |
Understand the scope of certificates and company documents
The existing company archive includes an attestation image referring to machinery/EMC requirements, a company credit-rating image and Chinese trademark-registration images. These documents serve different purposes. Small archived images do not establish current validity, applicability to every model or compliance of a particular installation.
| Archived document type | Relevant scope | What must not be inferred |
|---|---|---|
| Machinery / EMC attestation image | Subject, issuer, listed product scope and validity need a legible document | Not a blanket CE, ATEX, food-contact or pharmaceutical certification claim |
| Company credit document | Corporate credit context | Not a product test report or technical performance certificate |
| Chinese trademark records | Brand-registration context for the named marks | Not evidence of product safety or registration of a new English logo |
Request project-specific documentation
List any required material certificates, inspection reports, analytical sieve verification, electrical documents or special compliance requirements before the configuration is quoted. Availability and scope need to be confirmed for the actual equipment. We do not present an illustrative checklist as an issued certificate or test report.
Use a consistent identification chain
A practical document register records the order/reference, model, drawing revision, relevant component or sieve identifiers, document title/version and the requirement it supports. Agree the actual deliverable list with the team; it is not safe to assume every catalogue machine includes the same documents.

