Screening & Sieving. Built Around Your Material.
About UsManufacturingMaterial Testing

MATERIAL APPLICATION

Salt Screening

Plan salt screening around crystal size, moisture, lump formation and contact-material compatibility.

Specify salt condition and the duty

Dry crystal grading is different from screening damp salt or treating a salt-containing liquid. State the moisture condition, temperature and whether fines or oversize are rejected. Do not select a material of construction solely because it is described as stainless steel.

Agree the evaluation and its limits

Salt and cleaning media can create corrosion considerations that depend on concentration, temperature and exposure. Request a component-level material review for the actual process. A grade mentioned on a general product page is not a corrosion guarantee for the complete installation.

Information for this material enquiry

Prepare the following material-specific information before a configuration is proposed.

  • Dry, damp or liquid-containing salt feed
  • Target crystal fractions and moisture information
  • Process and cleaning conditions for corrosion review

Shortlist a screening route for this duty

Shortlist a screening route for this duty
Material taskCandidate / next decisionWhy this boundary matters
Dry crystal size gradesCompare YB, SZF and rectangular seriesParticle distribution, fines and abrasive conditions
Damp salt or salt-bearing liquidReview a separate wet-screening arrangementCorrosion exposure, viscosity/solids and useful stream
Material of constructionSpecify contact components and cleaning mediumNeither a stainless label nor 316L alone is a corrosion guarantee

Prepare the comparison and sample request

Discuss Your Requirements →
Salt Screening

Explore the application.

LET'S START WITH YOUR MATERIAL

What do you need to separate?

Discuss Your Requirements →